|
Always
unpack your shipment and check the contents thoroughly. Be
certain you have all the materials and tools necessary to
complete the installation before going to the job site.
Material and tools may include:
Installation Template or SpacingTape, Turkey Baster or
Compressed Air, Bolt Cutters, Wrench, Studs, Nuts and Washers
(or pads), Sign Letters (duh :), Shims, Masking Tape, Silicone
Adhesive, Drill and Drill Bits, Safety Glasses, Shop Brush,
Level and Ladder. |